Indian Railways sets 120-day deadline to redevelop 4 platforms at Ahmedabad Railway Station

10971569 ahmedabad
- ✓10971569 ahmedabad
- ✓Redevelopment of Ahmedabad Railway Station: Indian Railways has set a 120-day deadline to redevelop four platforms at Ahmedabad Railway Station.
- ✓According to the construction plan, a total of 457 piles, 108 pile caps and 213 pedestals will be constructed for platforms 4/5 and 6/7.
- ✓The project also involves the fabrication and erection of around 6,400 metric tonnes (MT) of structural steel.
Redevelopment of Ahmedabad Railway Station: Indian Railways has set a 120-day deadline to redevelop four platforms at Ahmedabad Railway Station. The project includes the construction of a modern, world-class concourse and improved passenger facilities.
The station falls under the administrative jurisdiction of the Western Railway (WR) zone. To speed up the work, Ahmedabad Division DRM Ved Prakash held a review meeting with officials from the Rail Land Development Authority (RLDA), railway departments and the construction agency.
During the meeting, officials discussed construction progress, technical challenges, availability of manpower and machinery, supply of construction materials, and coordination among different agencies. The planning of traffic and power blocks required for the work was also reviewed.
According to the construction plan, a total of 457 piles, 108 pile caps and 213 pedestals will be constructed for platforms 4/5 and 6/7. The project also involves the fabrication and erection of around 6,400 metric tonnes (MT) of structural steel.
These structures will form the foundation for the new concourse and other associated facilities. The DRM also directed officials to prioritise pile foundation work, pile caps with pedestals, Ballast Less Track (BLT) and structural steel fabrication and erection.
He stressed the need for detailed planning at every stage, along with adequate manpower, machinery and construction materials, to complete the work within the 120-day deadline. "The redevelopment of Ahmedabad Railway Station is one of the important infrastructure projects of Indian Railways.
The objective is to provide passengers with modern, safe, convenient and world-class station facilities," Ved Prakash said. Ahmedabad is an important railway station with significant passenger and train movement. Therefore, the redevelopment work will have to be carried out while maintaining smooth train operations and ensuring passenger safety.
Anish Mondal is a journalist with over nine years of experience covering the railways and roadways. ... Read More
- •Aspirants and citizens are advised to monitor official notices and circulars issued by The Indian Express National.
- •Verify all prescribed eligibility criteria, cutoff dates, and authenticated document requirements prior to formal submissions.
- •Track connected examination timetables, vacancy advisories, and administrative gazettes on SuchnaSetu.
| Issuing Authority | The Indian Express National |
|---|---|
| Topic Category | STATES |
| Jurisdiction | All India / National |
| Publication Date | 20 November 2026 |