ISRO aims to end the year with first operational launch of SSLV

10977044 isro chief v narayanan.jpg
- ✓10977044 isro chief v narayanan.jpg
- ✓The second and the third development flights, in February 2023 and August 2024, were declared successful.
- ✓Narayanan on Tuesday said the industry built PSLV will be launched in the first quarter of 2027.
THE INDIAN Space Research Organisation (ISRO) is set to end the year, which saw fewer missions following the back-to-back failures of its workhorse PSLV, with a key mission — the first operational launch of SSLV. “We are aiming to launch another SSLV mission in December,” confirmed a senior ISRO official.
The space agency needs to carry out two successful development missions before a launcher is declared operational. It has already carried out three development flights of SSLV so far, with the first one, on August 7, 2022, falling short of placing the satellites in the intended orbit.
The second and the third development flights, in February 2023 and August 2024, were declared successful. “We have already conducted one ground test and will be ready to launch the PSLV after another ground test,” he told The Indian Express.
The space agency conducted the first ground test after making the requisite changes following the failures of PSLV C-61 in May 2025 and PSLV-C62 in January 2026. Both missions failed due to anomalies in the third and the uppermost stage of the rocket.
According to ISRO, the reasons behind the failure of the two missions were different. After the failures, the third-stage configuration was revisited comprehensively and changes were made with respect to design margins, raw material acceptance criteria, assembly procedures, and quality checks that followed.
The design was strengthened and essential improvements were also made to the nozzle configuration. The Indian Express on Monday reported that the launch of the privately built PSLV-N1 may have to wait until after the launch of ISRO’s own PSLV.
Narayanan on Tuesday said the industry built PSLV will be launched in the first quarter of 2027. As against a planned 17 launches for FY 2026-27 — including at least four PSLV and five SSLV missions — as per ISRO’s annual report, the space agency was able to achieve only three launches this year, including the failed PSLV-C62.
The space agency launched the earth observation satellite EOS-5 in September and much-awaited navigation satellite NVS-03 in October, bringing the country’s navigation system back online. Anonna Dutt is a Principal Correspondent who writes primarily on health at the Indian Express.
She r... Read More
- •Aspirants and citizens are advised to monitor official notices and circulars issued by The Indian Express National.
- •Verify all prescribed eligibility criteria, cutoff dates, and authenticated document requirements prior to formal submissions.
- •Track connected examination timetables, vacancy advisories, and administrative gazettes on SuchnaSetu.
| Issuing Authority | The Indian Express National |
|---|---|
| Topic Category | TECHNOLOGY |
| Jurisdiction | All India / National |
| Publication Date | 24 November 2026 |