Skip to main content
National News Desk
technology

No brakes required: How India's highways are now charging toll without stopping you

Times of India NationalBy Aadrita Halder
20 Nov 2026
Original: English
No brakes required: How India's highways are now charging toll without stopping you
No brakes required: How India's highways are now charging toll without stopping you
Visual Coverage
AI Synopsis & Key Briefing

No brakes required: How India's highways are now charging toll without stopping you

Key Highlights & Official Takeaways
  • ✓No brakes required: How India's highways are now charging toll without stopping you
  • ✓NHAI announced India’s first MLFF system at the Chorayasi Toll Plaza on the Surat–Bharuch section of NH-48 in Gujarat.
  • ✓Rajasthan’s first MLFF plaza opened at Daulatpura on the Delhi–Jaipur section of NH-48 on 19 June.
  • ✓Gharaunda on the Panipat–Jalandhar section of NH-44 came next, and Manoharpura on the Delhi–Jaipur road followed on 1 July.
Comprehensive News & Policy Report

NewsIndia NewsNo brakes required: How India's highways are now charging toll without stopping you No brakes required: How India's highways are now charging toll without stopping you For two decades the toll plaza has been a fixture of the Indian highway: the slowing down, the queue, the wait for a barrier to lift.

Over the past six months, at a handful of locations across the country, that routine has started to disappear. Vehicles now pass under overhead gantries without stopping, and the toll is settled electronically afterwards.The technology is called Multi-Lane Free Flow, or MLFF.

It lets vehicles pass through toll locations without stopping. It is still a small part of a very large network, but it marks the biggest change in how India collects highway tolls since FASTag made cashless payment routine.How the system worksMLFF does not replace FASTag.

It builds on it. The framework combines Automatic Number Plate Recognition (ANPR) with FASTag-based electronic collection: cameras read number plates as vehicles pass under gantries, and the FASTag account is debited automatically.

Because of the “One Vehicle, One Tag” policy, each FASTag is tied to a vehicle’s registration number, so the equipment can create a toll transaction by reading the tag, the number plate, or both.The government says the aim is a faster and cleaner journey.

NHAI says the technology should cut travel time, improve fuel efficiency, and make road transport safer and more sustainable.Six months, seven plazasThe first site went live on 1 May 2026. NHAI announced India’s first MLFF system at the Chorayasi Toll Plaza on the Surat–Bharuch section of NH-48 in Gujarat.

Mundka-Bakkarwala on the Urban Extension Road-II in the Delhi-NCR region followed as the second. Union Minister Nitin Gadkari inaugurated it.The summer brought more. Rajasthan’s first MLFF plaza opened at Daulatpura on the Delhi–Jaipur section of NH-48 on 19 June.

Gharaunda on the Panipat–Jalandhar section of NH-44 came next, and Manoharpura on the Delhi–Jaipur road followed on 1 July. Shahjahanpur, also on NH-48 in Rajasthan, went live in August. With that, all three plazas on the corridor supported non-stop passage.

The system then moved south. On 1 October, NHAI rolled out Tamil Nadu’s first MLFF system at Paranur Toll Plaza on the Tambaram–Tindivanam section of NH-179B. Seven plazas are now operational.That is slower than planned.

NHAI had targeted 17 plazas across nine states by September 2026.What happens when the payment failsThe harder question is what happens when the FASTag does not work. Without a booth, there is no one to stop the vehicle.

The framework answers this with an electronic notice, or e-notice.If the FASTag balance is insufficient, or the tag is invalid or non-functional, the motorist is issued an e-notice and must pay the normal fee within 72 hours.

After that, the amount is charged at twice the normal rate for the vehicle category. The notice is sent by SMS to the mobile number registered against the vehicle in the VAHAN database, and to the number linked to the FASTag.

The mechanism rests on Rule 14 of the National Highway Fee Rules, 2008.Notices can be checked and paid on the designated portal, and a grievance can be raised there within the same 72 hours. The e-notice can also be viewed on the Rajmargyatra mobile app.

The stakes of ignoring one go beyond the doubled fee. Non-payment may lead to the FASTag being blacklisted and to restrictions on other vehicle-related services through the VAHAN platform.multi lane free flow mlff barrierless tolling what to know features how to check enoticeNHAI’s advice to motorists is plain.

Keep the FASTag balance sufficient, keep the tag active and properly affixed on the windshield, and use a clear High Security Registration Plate, whose laser-etched serial number the ANPR cameras can read.The early numbersA Crisil Intelligence analysis gives the first real measure of how the system is performing.

By 1 August, six plazas had together processed more than 110 lakh vehicle transactions and collected over Rs 147 crore in toll revenue since Choryasi opened. Choryasi led on revenue at more than Rs 51 crore, while Mundka handled the highest volume, at over 41.5 lakh transactions.FASTag is still doing most of the work.

It accounted for roughly 94 per cent of revenue between May and July, about Rs 138.4 crore, against Rs 9.2 crore collected through e-notices. The notice figures show how large the compliance problem is. About 10 per cent of vehicles passing through the operational plazas triggered a payment failure, roughly 10.5 lakh notices in all.What the government expects to saveThe ministry’s case rests on money, fuel and emissions.

It expects MLFF to cut operational costs by Rs 5,000–6,000 crore a year and save around 250 crore litres of fuel annually, which it puts at nearly 81,000 tonnes less CO2, mainly by reducing idling and congestion at toll points.

Once fully rolled out, the system is projected to handle more than 450 crore vehicle passages a year.The plan for the next phaseThe current network is a pilot compared with what is planned. NHAI has invited bids to extend MLFF to 104 more plazas across Haryana, Uttar Pradesh, Telangana, Andhra Pradesh, Odisha, Gujarat and Rajasthan.

Combined with plazas already operational or awarded, that would bring the total to 121. That is only 10–11 per cent of the more than 1,150 physical plazas now active nationwide.Passes for the frequent travellerThe shift comes alongside changes to how regular users pay.

The annual FASTag pass, launched in August 2025, was being used by around 52 per cent of private vehicles at these plazas. Its standard price is Rs 3,075.A cheaper option for people who live near plazas took effect on 1 November.

The ministry introduced a Concessional Local Pass for eligible non-commercial vehicle owners living within 20 km of a fee plaza. It costs Rs 1,500 a year at plazas outside municipal or local town limits and Rs 3,000 at...

Actionable Steps for Aspirants & Citizens
  • •Aspirants and citizens are advised to monitor official notices and circulars issued by Times of India National.
  • •Verify all prescribed eligibility criteria, cutoff dates, and authenticated document requirements prior to formal submissions.
  • •Track connected examination timetables, vacancy advisories, and administrative gazettes on SuchnaSetu.
Official Notice Specification
Issuing AuthorityTimes of India National
Topic CategoryTECHNOLOGY
JurisdictionAll India / National
Publication Date20 November 2026
Connected Government Jobs & Upcoming Exams
Active on SuchnaSetu
Official Source Attribution: Times of India National
View Publisher Source Link

SuchnaSetu provides verified civic and public policy reports based on official notices. Primary publication and copyright remain with the respective government authority or publisher.